Servers

Servers

Accelerate Your Transformation with our Ready-to-Ship Servers and Solutions for Tomorrow's Critical Workloads

all-servers pic
View as List Grid

2 Items

per page
Set Descending Direction
  1. Gold Series
    Supermicro AS -E300-14GR-01-G2 Mini-1U Fan-Based IOT/Embedded H14 UP Gold Series SuperServer
    Supermicro AS -E300-14GR-01-G2 Mini-1U Fan-Based IOT/Embedded H14 UP Gold Series SuperServer

    Starting at

    €3,210.46

    • Key Features/Applications: Retail Store Appliance
    • CPU: Single AMD EPYC™ 4545P Processor, 16 Cores
    • Chassis: Mini-1U / Fan-based Embedded
    • Drive: 1x 960GB M.2 NVMe SSD
    • RAM: 1x 32GB DDR5-5600 UDIMM Memory
    • Network Ports: 4x 1GbE RJ45 LAN Ports
    • Power Supply: 1x 180W DC Power Adapter
    • Pre-Configured Mini-1U Embedded System View Datasheet

    Lot 9 Compliance Notice: This product is exempt from Lot 9 requirements in accordance with relevant regulations. Before purchasing, please ensure the equipment type or your intended use for this product aligns with the Lot 9 exemption criteria.

    Please find the details here.

    * Estimated lead time is currently 2-3 weeks. Actual delivery schedule will depend on quantity and availability.

  2. Gold Series
    Supermicro SYS-E300-14AR-01-G2 Mini-1U Fan-Based IOT/Embedded X14 UP Gold Series SuperServer
    Supermicro SYS-E300-14AR-01-G2 Mini-1U Fan-Based IOT/Embedded X14 UP Gold Series SuperServer

    Starting at

    €2,975.92

    • Key Features/Applications: QSR/Retail Workflow Management, Compact System, Intelligent Edge
    • CPU: Single Intel® Core™ Ultra U5-245 Processor, 14 Cores
    • Chassis: Mini-1U Fan-based Embedded
    • Drive: 1x 960GB M.2 NVMe SSD
    • RAM: 2x 16GB DDR5-5600 SODIMM Memory
    • Network Ports: 2x 2.5GbE RJ45 + 2x 10GbE RJ45 LAN Ports
    • Power Supply: 1x 180W Power Supply
    • Pre-Configured Compact Edge System

    Lot 9 Compliance Notice: This product is exempt from Lot 9 requirements in accordance with relevant regulations. Before purchasing, please ensure the equipment type or your intended use for this product aligns with the Lot 9 exemption criteria.

    Please find the details here.

    * Estimated lead time is currently 2-3 weeks. Actual delivery schedule will depend on quantity and availability.

View as List Grid

2 Items

per page
Set Descending Direction