Fast Delivery

Pronti per la spedizione!

Sistemi pronti all'invio, completamente configurati e validati per i carichi di lavoro più impegnativi

fast-delivery pic
View as Elenco Grid

2 Items

per pagina
Set Descending Direction
  1. Gold Series
    Supermicro SYS-212GB-FNR-01-G2 2U Rackmount X14 UP Gold Series GPU SuperServer
    Supermicro SYS-212GB-FNR-01-G2 2U Rackmount X14 UP Gold Series GPU SuperServer

    Starting at

    43.834,67 €

    • Key Features/Applications: Enterprise AI, Chatbot/RAG, Document Processing, Content Creation, Recommendation, Synthetic Data Generation, Agentic AI, HPC, CAD/CAE/CFD, Scientific Research (Modular Dynamics, Weather Forecast, Geological Analysis)
    • CPU: Single Intel® Xeon® 6731P Processor, 32 Cores
    • Chassis: 2U
    • Drive: 1x 960GB M.2 PCIe Gen 4.0 NVMe + 2x 3.84TB E1.S PCIe Gen 5.0 NVMe SSD
    • RAM: 8x 64GB DDR5-6400 RDIMM Memory
    • GPU: 2x NVIDIA RTX PRO™ 6000 Blackwell Server Edition GPUs
    • Network Ports: 2x 10GbE RJ45 LAN Ports (Broadcom 57416)
    • Power Supply: 2x 2700W Redundant Titanium Level Power Supplies
    • Pre-Configured Agent Flow AI Inferencing System (SaaS) View Datasheet

    * Estimated lead time is currently 2-3 weeks. Actual delivery schedule will depend on quantity and availability.

  2. Gold Series
    Supermicro AS -1015A-MT-01-G2 1U Rackmount H13 UP Gold Series Mainstream SuperServer
    Supermicro AS -1015A-MT-01-G2 1U Rackmount H13 UP Gold Series Mainstream SuperServer

    Starting at

    4.208,53 €

    • Key Features/Applications: Remote Office/Branch Office Infrastructure
    • CPU: Single AMD EPYC™ 4564P Processor, 16 Cores
    • Chassis: 1U
    • Drive: 1x 1.92TB M.2 NVMe SSD
    • RAM: 1x 32GB DDR5-5600 UDIMM Memory
    • Network Ports: 2x 1GbE RJ45 LAN Ports
    • Power Supply: 1x 500W Platinum Level Power Supply
    • Pre-Configured 1U UP Mainstream A+ System View Datasheet

    Lot 9 Compliance Notice: This product is exempt from Lot 9 requirements in accordance with relevant regulations. Before purchasing, please ensure the equipment type or your intended use for this product aligns with the Lot 9 exemption criteria.

    Please find the details here.

    * Estimated lead time is currently 2-3 weeks. Actual delivery schedule will depend on quantity and availability.

View as Elenco Grid

2 Items

per pagina
Set Descending Direction